ÂÜÀòžž

J block is about to undergo and significant refurbishment. Commencing mid-September, our goal is to make J Block a vibrant and attractive precinct for Secondary students and staff to support learning and foster a sense of community.

What is happening?

Classroom upgrades
Improved lighting
Covered Area
Enhanced Locker Rooms
Roof replacement

Classroom upgrades

We are reconfiguring five general learning classrooms to optimise space and functionality. The redesigned layout will offer a more conducive learning environment, fostering engagement and collaboration.

Improved lighting

We’re installing new windows and glass doors on the east side of the building to provide the classrooms with natural light, creating a brighter and more inviting atmosphere.

Covered Area

To enrich the student experience during recess and lunch, we’re building a new covered space on the eastern side of J Block. This area will lead directly to the school oval, providing a spacious and sheltered spot for Secondary students to relax and socialise.

Enhanced Locker Rooms

We’re addressing the current issues with cramped locker rooms for Year 8 and Year 9 students. The refurbishment will create a more functional and comfortable space for students to store their belongings across two levels.

Roof replacement

The entire colorbond roof of J Block is being replaced. This crucial upgrade will ensure the building’s durability and improve its overall aesthetic appeal.

How will this refurbishment impact school activities?

We understand that construction can raise concerns, particularly with important events like the HSC exams. Rest assured, we are taking every precaution to minimise any disruptions:

  • Noise Sensitivity: The builders will be highly sensitive to noise levels, ensuring minimal impact during the construction period.
  • Proximity to HSC Exams: The building is located 100 meters away from the main HSC exam area, so we anticipate no interference with the exams themselves.
  • Timely Construction: With Year 12 students not requiring classroom space during this period, we’ve strategically timed the refurbishment to fit within a 17-week window, aligning with the school calendar to minimize disruptions to daily activities.

Our aim is to ensure a smooth transition and maintain a conducive learning environment throughout the refurbishment. We appreciate your understanding and support as we work to enhance J Block for the future.


How can the school support this refurbishment?

Pray with us

Pray for the safety of students, staff and contractors throughout this period.

Invest

For those who are able, please consider giving a one-off or recurring tax-deductible gift.

Please use the form below to donate to make a one-off donation the Building Fund. To make a recurring gift please contact Andrew Lowry.

Thank you for your ongoing prayerful partnership.

 

Type on the line above then press the Enter/Return key to submit a new search query